CIPP Repair

Granite Construction anticipates making internal repairs to the sanitary sewer line located at the intersection of W. Little York and Addicks Satsuma on June 9-10, 2020. The existing sanitary sewer line will be repaired with a cured in place plastic pipe that will restore the integrity of the pipe.

Anyone passing by should see several trucks working and potentially steam exuding from the sanitary sewer manholes at the intersection. This is all normal.

We request that the residents in the area minimize their water use during this period by waiting to wash dishes and clothing until after 7 P.M. each day.